Osama Elshorbagy

Associate Director Delay Analysis & Project Controls

Qualifications

  • BSc. Architectural Engineering
  • PSP
  • PMP
  • PMI-RMP
  • AAPE
  • ACIArb

Osama Elshorbagy is a bilingual (Arabic / French ) delay and project controls expert.

He has worked with some of the world’s largest EPC contractors and has excellent technical skills on projects both onshore and offshore across a variety of sectors in the MENA region.

Osama is currently studying for a master’s degree in Construction Law and Arbitration at Robert Gordon University.

 

Barazan Onshore Project (Building PK1 &3) Process (Trains 1 &2). Qatar
The project was to process a total feed gas quantity of 1.9 billion SCFD. The facilities comprise Gas Receiving and Condensate Stabilization Unit, Acid Gas Removal Unit (2 trains), a Dehydration and Mercury Removal Unit (2 trains) Mercaptan Removal Unit (2 trains), NGL Recovery / N2 Rejection Unit (2 trains), a Sulfur Recovery Unit (2 Trains)

Oil & Gas
Renewables Energy
Power Plants
Manufacturing Plants
Infrastructure

Healthcare
Heavy Civil Projects
Hotels & Buildings
Marina /Airport/Rail

 

WATER MEGA RESERVOIRS PROJECT

BARAZAN ONSHORE PROJECT (BUILDING PK1&3) PROCESS (TRAINS 1&2),

Tawad Gas- Sonatrach-complex project

Tunis Garden City

Marsa el – Brega Energy City (LB116)

Four Season Hotel -Nile Plaza Renovation project

MUP Pharmaceutical Plant

Zafarana Wind Farms (545 MW)

PV Plant 50 MWp, MV cable interconnection and Substation 22/220 KV, 125 – Design & Build

South Helwan Power Plant 3X650 MW

Ras Ghareb Wind Farm Development

Four Seasons Hotel-Madinaty, Cairo